After the successful opening of the new office, Jan and Kim have asked that you return to plan and to implement phase 2 of their plan. You are familiar with their existing network setup. They have budgeted for a large expansion to their network using static IP addresses. They will be purchasing the following:
- 3 additional servers
- 24 more workstations
- 3 more printers
- Prepare a 2–3-page diagram showing the necessary locations for wired connections throughout the office. Illustrate the following:
- the server installation process
- changes to the existing server
- the IP addressing subnetting scheme and how it changed from phase 1 of the project
- a minimum of 8 screenshots with detailed explanations
- In a 6–10-slide PowerPoint presentation with notes, explain the following:
- the IP addressing subnetting scheme and security as part of the design
- how the IP addressing subnetting scheme and security changed from phase 1 of the project
- any additional equipment required
- any necessary changes to the operating systems
- network services that would be needed, given the changes to the network
- what needs to be done, if anything, to the existing the facilities or systems to integrate the old system with the new one
- TCP/IP services that should be considered, and an explanation why
- Provide a 2–3-page detailed installation guide appropriate for general use on setting up the servers along with 32 clients.